Login | Register
產(chǎn)品中心
Home > Products > Screw pumps > Long lead screw pump
view  
 
A Long Lead Screw Pump is a high-performance positive displacement pump designed for the precise and efficient transfer of viscous, abrasive, and shear-sensitive fluids in demanding industrial applications. Featuring an extended lead screw and rotor-stator mechanism, this pump provides continuous, low-pulsation flow while handling large volumes with minimal energy consumption. Its long lead design ensures smooth and stable operation, making it ideal for industries such as chemical processing, food and beverage, pharmaceuticals, oil and gas, and wastewater treatment. The Long Lead Screw Pump excels at pumping high-viscosity liquids, pastes, and slurries, including oils, resins, adhesives, syrups, and sludge, without causing shear damage or compromising product quality. Constructed from durable, corrosion-resistant materials, it offers excellent wear resistance, long service life, and reliable performance even under harsh conditions. The pump’s robust yet compact design allows for easy installation, maintenance, and integration into automated production systems, reducing downtime and operational costs. With strong suction capabilities, high efficiency, and energy-saving performance, the Long Lead Screw Pump is suitable for continuous, precise, and hygienic fluid transfer, providing a versatile and dependable solution for modern industrial processes requiring consistent flow, accuracy, and durability.
  • Long lead screw pump

    Long lead screw pump

    The Long Lead Screw Pump is a specialized positive displacement pump designed for efficient transfer of highly viscous, abrasive, and particulate-laden fluids. Distinguished by its extended lead rotor, this pump delivers steady, non-pulsating flow over long distances and is ideal for applications requiring consistent metering, high pressure, or precise dosing.

    Send Inquiry

This website uses cookies to ensure you get the best experience on our website.

Accept Reject
莱阳市| 白银市| 新蔡县| 萨嘎县| 潍坊市| 焦作市| 松潘县| 新闻| 莱州市| 靖安县| 和平区| 苍溪县| 阿瓦提县| 精河县| 象山县| 扬中市| 佛冈县| 麦盖提县| 平果县| 香港 | 沈丘县| 女性| 灌云县| 孟津县| 海口市| 胶南市| 静海县| 邻水| 集安市| 凌源市| 大兴区| 台北县| 霍州市| 奎屯市| 阿巴嘎旗| 松潘县| 庆元县| 阆中市| 清徐县| 东明县| 枣阳市|